CPR Part 45 Section VII Intermediate Track Fixed Costs Calculator
Fixed recoverable costs for intermediate track cases
How to use this calculator
Select the complexity band and stage reached, specify any additional defendants and London weighting. The calculator computes fixed recoverable costs for the intermediate track.
This calculator applies to claims on the intermediate track where the cause of action accrues on or after 1 October 2023. It implements all 16 stages from PD 45, Table 14. Cumulative stages represent the highest stage reached; separate stages are additional amounts for specific steps taken.
Case details
Damages
£
Description
Amount (£)
Interest Rate (%)
From Date
To Date
Interest (£)
Action
£0.00
£0.00
£0.00
Cumulative Stage (Select Highest Reached)
If checked, the "less £X" deduction will be applied to the S8 fee.
Separate/Additional Stages
Bands 1-2: flat fee
Bands 3-4: Choose one option:
(Disabled if S16 is selected)
(Disabled if S16 is selected)
(Only available if S13 is selected)
Choose timing option:
Note: S16 and S10/S11 are mutually exclusive. Selecting S16 will disable S10 and S11.
Disbursements
£0.00
£0.00
£0.00
Calculation Results
Damages Summary
Total Damages (inc. interest):
£0.00
Fixed Costs Breakdown
Subtotal (Fixed Costs ex. VAT):
£0.00
London Weighting (12.5%):
£0.00
Total Fixed Costs (ex. VAT):
£0.00
VAT on Fixed Costs (20%):
£0.00
Total Fixed Costs (inc. VAT):
£0.00
Disbursements Summary
Total Disbursements (ex. VAT):
£0.00
VAT on Disbursements (20%):
£0.00
Total Disbursements (inc. VAT):
£0.00
TOTAL AMOUNT RECOVERABLE
£0.00
Export to PDF
Add case details for the PDF heading. These fields are optional — leave blank to omit from the schedule.